BG head office
A speculative office building with high quality, low cost maintenance exterior finishes. Passive solar control was incorporated in the façade with the use of large overhangs, louvered sun shading, and low energy transmission glass. The construction period was 16 months and the building was completed on schedule and within budget.
Project Client:
BG Trinidad and Tobago
Project Architect
acla:works
Project Contractor
NH International
Civil + Structural Engineers
KS&P Limited
Mechanical + Electrical Engineers
ADeB Consultants Ltd
Quantity Surveyor
Hart & Leonard
Project Management
acla:works
Area
3,600 sq metres
Function
Office building
Location
St Clair, Trinidad
Status
Completed 2002